Water Resource Department

Last Updated on:

PROFILE OF THE DEPARTMENT/ORGANIZATION

Introduction:

The Office of the Executive Engineer, Morigaon Water Resources Division (Originally known as Morigaon E & D Division) comprises 2 Sub Division ie Morigaon-Laharighat Sub District and Jagiroad Sub-District respectively. The Morigaon Division and Jagiroad W.R. Sub-Division were established in 1989 while the Morigaon W.R Sub-Division was established during early fifties. This is the only Division in Morigaon under Water Resources Department, where there are numerable major meandering rivers in Morigaon District viz., Kopilli, Killing, Kollong and Brahmaputra along with their innumerable Sub-channels. In this glorious span of 36 years, this division has been successful in constructing many embankments, sluice gates, carrying out protection woks as well as anti-erosion works while safeguarding the district and its netizens for more than three decades.

Vision

Optimal sustainable protection of the state of Assam against flood and river bank erosion including providing relief to the drainage congested areas of the state.

Mission

  • To develop policies, programmes and practices, formulation and execution of  schemes/projects which would enable optimum management of floods and control the river bank erosion including providing optimum relief to the drainage congested areas of the district with active involvement of all stakeholders for reducing the damages due to flood to minimum level.
  • To put into place systems and practices, which would result in sustainable increase in flood and erosion protected areas of the distritc for all round development.
  • To actively prepare affirmative piolicies for evaluation and execution of effective measures for flood management in the state.
  • To disseminate information, skills and knowledge, which would help in  mass awareness amongst the local population.

Objectives

  • To control  river bank erosion
  • To prevent flood inundation
  • Drainage development
  • Land reclamation and river channelization
  • Collection of hydro-meteorological data

Ongoing Schemes under Morigaon Water Resources Division

Sl No.Name of schemeEstimated CostTarget date of completion
UNDER NABARD RIDF
1Anti-erosion measures to protect Pabhakati/Garubandha area from erosion on the left bank of river Brahmaputra (RIDF-XXVIII)3518.00 LJan-26
2A/E measures to protect Murkata area under Mayong Revenue Circle from the erosion of river Brahmaputra (RIDF-XXVIII)983.00 LJan-26
3Construction of T/Dyke on left bank of river Kollong from Dighaliati to Telahi including construction of sluice gates. (RIDF-XXIX)3580.69 LApr-26
4Anti-erosion measures to protect Kasohilla area from the erosion of river Brahmaputra (RIDF-XXIX)1450.00 LJan-26
5Pro-siltation measures to protect Boramari area from the erosion of river Brahmaputra (RIDF-XXIX)195.00 LJan-26
6Construction of Sluice Gate at Pokoria river including construction of flood protective embankment alongwith anti-erosion measures (Ph-I) (RIDF-XXIX)1500.00 LWork physically complete
7Anti erosion measures to protect both bank of river Killing from erosion at different reaches (Ph-II)474.00 LMay-26
8Recoupment of flood embankment on both bank of river Kollong at different reaches including protection measures and construction of T/dyke on L/B from Ch.6025m to Ch.7375m.350.00 LJun-26
9A/E measures to protect Gunamora area from the erosion of river Kollong. (RIDF-XXX)900.00 LJan-26
UNDER NIDA
10Construction and shifting of HT & LT line along with dismantling works due to construction of embankment from Dighaliati to Khatobori (NIDA)163.21 LJan-26
11Anti-erosion measures to protect both bank of river Killing from the erosion at different reaches (Ph-I)756.00 LWork physically complete
UNDER SOPD-FDR
12Contruction of T/dyke along Right bank of river Killing from Ouguri to NH-Way1600.00 LWork hampered due to L.A. issue and Public Obstruction with resistance from Gopal Krishna Tea Estate and Sah Majdur Union and work is restarted from 21.02.24
UNDER ADB
13Climate Resilient Brahmaputra Integtated Flood and Riverbank Erosion Risk Management Project in Assam-Morigaon, Nagaon,Tezpur Sub Project (Zone-B) {Morigaon Sub-Project, Phase 1(A)}24830.00 LJan-27
    

Photographs of Various Schemes

A Gunamora
At Gunamora
At Ouguri
At Ouguri

At Ouguri

At Bhojaikhaiti

At Bhojaikhaiti

At Bhojaikhaiti
AEE, Morigaon-Lahorighat WR Sub-District; Superintending Engineer, Central Assam W.R Circle; Executive Engineer, Morigaon W.R Division

 

List of Employees under Morigaon Water Resources Division

Name of PostName of IncumbentContact No
Executive EngineerLochan Kumar Choudhury9435065021
Assistant Executive  EngineerDr Juran Ali Ahmed9435101544
Dipankar Roy8812993964
Assistant EngineerPinku Sarma 9531225924
Himangshu Yogi8638564991
Manash Jyoti Bora8638743358
Debayan Boruah8486106797
Rajashri Deka8638224985
Navajyoti Das9864879240
Accounts OfficerLakhyan Pegu8638101382
Assistant Accounts OfficerShikhamoni Das8011705038
Junior EngineerRantumoni Saikia9435225043
Surajit Goswami9101504603
Dhanjit Uzir8638753193
Hari Deka8399054717
Rajib Gogoi9508277399
Ranjit Barma9435194678
Pranamika Bora8638595038
Sub-Engr. Grade-IDibakar Sarma7002311471
Senior AssistantAkhtaruddin Ahmed9435002519
Bulu Bora9957705091
Abhijit Bordoloi9854516063
Chittaranjan Nath9854210440
Junior Assistant.Sohidul Hoque9401877464
Mousumi Hoque8135960883
Suresh Nath9859470611
Kamal Thakuria9957782252
Nasika Rahman9101156220
Ankur Ranjan Hazarika8472821752
Gouranga Mandal6001336526
Bishnubrot Borah7002755422
Dibakar Gogoi9365639377
Sub-Engr. Grade-IIJyoti Deka9435479978
Dipa Hazarika9401687094
Man Mohan Rai9864524201
Raju Kr. Das9954076939
Section AssistantPrasanta Goswami9435141997
Nila Kanta Bora9954131189
Ibadur Rahman9435364031
Ruhul Amin9435236401
Nektar Ali8752084755
Kamal Ch. Nath9859173161
Ranto Kalita6901683629
Diganta kalita8638969338
Monjyoti Nath9132193914
Sanjeev Bora9706521390
Tinku Moni Deka8399955620
Koustov Moni Amphi6003924770
Jyotishman Das8638654764
Amarjit Raja7086883896
DafadarLakhi Kt. Bora9954360959
Office PeonSantoshi Deka7099809367
Pranab Dekaraja9365498812
Sutapa Roy9101564008
Khalasi (Regular)Minabala Rabha7577866183
Phukan Medhi9854210197
Krishna Moni saikia8723942939
Deep Jyoti Nath9101348350
Jack Raijung8134841060
Shiva Magor7896991072
Siba Sarkar9354892875
Juganta Kumar Nath6901429050
Risha Kumari9085805345
Jeherul Islam8729961345
Khalasi (Regular)Bishnupriya Patar9954477070
Jyotipal Sarmah9678257609
Nilima Manta9864806829
Nikumoni Deka9678442573
Manash Jyoti Rajkhowa9101186284
Rupa Devi8471911598
Biswajit Shill9394494180
Arjuma Akhtara8822069994
Ashadul Islam6003018641
Deepak Kurmi9365888279
Papon Borah9101207513
Khalasi (Personal Post)Abinash Roy9613632894
Robi Ram Das7636056632
Chandra Bora8011533287
Banamali Sarma9435647873
Mangalsing Medhi8011174052
Ranu Sarma9435398894
Sukleswar Nath9954136041
Somnath Upadhaya9854174832
Minu Kakati9835853242
Ritamoni Pathak9854704276
Harish Mazumdar9706193870
Someswar Deori6002133731
Abul Hussain9401447864
Dandi Ram Nath8876027507
Kushal Deka9435365637
Bipul Bora9435879174
Dilip Sarma9954720529
Khalasi (Personal Post)Mohan Kalita7399713470
Naren Bora7896287977
Simanta Sarma9859251285
Office ChowkidarBhrigumani Das9365175863
SweeperSontosh Balmiki9706665305

 

Contact us:

  • Office Address: O/o the Executive Engineer, Morigaon W.R. Division, Morigaon-782105
  • Name, Designation & Official Contact No. of Head: Sri Lochan Kumar Choudhury, Executive Engineer, Ph No. 9435065021
  • Official email id: morigaonwrdivision@rediffmail.com
Title Size Type
Administrative Approval of Anti-erosion measures to protect Pabhakati/Garubandha area from erosion on the left bank of river Brahmaputra (RIDF-XXVIII) 39.81 KB
Administrative Approval of A/E measures to protect Murkata area under Mayong Revenue Circle from the erosion of river Brahmaputra (RIDF-XXVIII) 39.81 KB
Administrative Approval of Construction of T/Dyke on left bank of river Kollong from Dighaliati to Telahi including construction of sluice gates. (RIDF-XXIX) 40.07 KB
Administrative Approval of Anti-erosion measures to protect Kasohilla area from the erosion of river Brahmaputra (RIDF-XXIX) 38.79 KB
Administrative Approval of Pro-siltation measures to protect Boramari area from the erosion of river Brahmaputra (RIDF-XXIX) 38.75 KB
Administrative Approval of Construction of Sluice Gate at Pokoria river including construction of flood protective embankment alongwith anti-erosion measures (Ph-I) (RIDF-XXIX) 38.76 KB
Administrative Approval of Anti erosion measures to protect both bank of river Killing from erosion at different reaches (Ph-II) 38.75 KB
Administrative Approval of Recoupment of flood embankment on both bank of river Kollong at different reaches including protection measures and construction of T/dyke on L/B from Ch.6025m to Ch.7375m. 38.8 KB
Administrative Approval of A/E measures to protect Gunamora area from the erosion of river Kollong. (RIDF-XXX) 38.73 KB
Adminitrative Approval of Construction and shifting of HT & LT line along with dismantling works due to construction of embankment from Dighaliati to Khatobori (NIDA) 38.95 KB
Administrative Approval of Anti-erosion measures to protect both bank of river Killing from the erosion at different reaches (Ph-I) 39.79 KB
Administrative Approval of Contruction of T/dyke along Right bank of river Killing from Ouguri to NH-Way 38.82 KB
Status of Ongoing Scheme as on 18.02.26 2.22 MB